Upgrade kit – Butyl extruder, type BEZ

Safeguarding the future


Three reasons to upgrade

1.

Frequency converters and control systems were discontinued by the manufacturers and are no longer available

2.

Avoid longer machine downtimes due to lack of spare parts

3.

After installing the upgrade kit, all spare parts are readily available from stock

Conversion to current frequency converter and current control


OLD VERSION. LIMITED LIFETIME.

Our upgrade kit completely modernizes your butyl extruder:

  • A modern touchscreen display replaces the manual control panel
  • Completely replaced and updated control unit
  • Contactors subject to wear are replaced by electronic
    switching elements

NEW VERSION. ALL OPTIONS AGAIN.

Your advantages:

  • Quick upgrade implementation, as ready-to-install upgrade
    kits are available from stock
  • Conversion of the butyl extruder within just one day
  • Adaptation of the setting parameters
  • Extensive functional tests
  • Personnel training carried out by our field service engineers
  • Calculable fixed price plus installation costs
  • Spare parts fully available from stock
  • Replacement of mechanical wear parts on request

References


Jaakko-Tuote, Finland

#flat glass laminating #laminating #ProL #ProL-zone #reference #upgrades

“The idea of investing in Glaston’s ProL-zone laminating furnace started as an R&D project for us. We wanted to see how it functions on one of our own safety glass lamination machines built in-house. The goal for us is to raise capacity and improve our lamination line’s energy efficiency. We’re starting an extremely demanding safety glass project and plan to put ProL-zone to the test,” says Aki Harjunpää, CEO of Jaakko-Tuote, Finland.

Read more

Glas Dreisbusch, Germany

#architectural #IG unit #insulating glass #TPS #VARIO

“The idea of a special U-shaped design to fit our confined space was created over lunch by my son Maximillian Dreisbusch and two Glaston service engineers. I think this says everything about our close and collaborative partnership with Glaston,” says Thomas Dreisbusch, Managing Director of Glas Dreisbusch.

Read more

Kristal, Bosnia and Herzegovina

#automation #iControL #scanner #upgrades

“We purchased the Glaston iControL and scanner upgrade to solve any concern with software or spare parts availability before they became an issue. Once installed, the upgrade helped us win a large glass façade project in Indonesia that required extremely high quality. Both we and Glaston can be proud of the high level of quality achieved,” says Matea Franjić, Chief Operating Officer (COO) of Kristal in Vitez, Bosnia and Herzegovina.

Read more

Articles


Strategies to minimize costs in insulating glass production

Prices for float glass have gone up considerably since the beginning of the energy crisis due to the high energy needed to produce it. As it is the main raw material...

Read more

How to reduce energy consumption in glass lamination

In our previous blog post, we covered some tips for improving energy efficiency in tempering. This time, let’s turn to glass lamination. Typically, the lamination...

Read more

3 ways to reduce energy consumption in glass tempering

The energy consumption of production equipment has always been an important topic. For glass processors, this topic has become even more urgent over the past year...

Read more

Contact information